Use the correct dieline
Build your design on the dieline supplied for the selected product, size and structure.
Artwork & Prepress Support
Prepare your artwork around the correct dieline, print method and packaging format. This guide covers the file setup details that help us review your project clearly before proofing and production.
Requirements can vary by product, material, size and print method. Always follow the dieline and submission instructions confirmed for your project.
Before you begin
A clear artwork file begins with the correct structure. These four checks prevent many of the issues that slow down review.
Build your design on the dieline supplied for the selected product, size and structure.
Preserve vector elements, organized layers and clearly identified images, fonts and finishes.
Review color mode, image resolution, bleed, safe areas and any process-specific instructions.
Check the product, dimensions, copy, placement and finish callouts shown in the proof before approval.
File preparation guide
Packaging artwork combines design with a physical structure. Cut lines, folds, seams, closures and printable areas can change from one format or size to another. Use the sections below as a preparation guide, then follow the project-specific dieline and instructions provided for your order.
01
Begin with the dieline supplied for the exact packaging format and size under review. Do not reuse a dieline from a similar product unless it has been confirmed for the new project.
02
Keep the file organized so the artwork and production notes can be checked without guessing which elements belong to the final design.
Brand_Product_Size_Artwork_V01
03
Screens, materials, inks, coatings and print processes reproduce color differently. Prepare the file for print, but keep the final color expectations tied to the approved proof and confirmed production method.
04
If the quotation includes a special finish, show its location separately from the printed artwork. The required setup depends on the finish and production method.
05
Use this final check to confirm that the file matches the current packaging project and is ready for artwork review.
06
The exact review, proofing, sampling and production steps depend on the product and quotation. A typical project may include the following checkpoints.
Share the requested artwork file and identify the product, size and project reference.
The file is checked against the available dieline and confirmed production details.
Any missing files, unclear layers or specification questions are returned for confirmation.
Check placement, copy, dimensions, colors and applicable finish callouts shown for approval.
Production conditions and the approved artwork version are confirmed according to the quotation.
07
Artwork may be collected through the applicable product, quotation or follow-up workflow. Accepted formats, file-size limits and the secure submission method are confirmed before upload. If your artwork is not ready, you can still share the product, quantity, destination, timing and current artwork status when requesting a quote.
Request a QuoteArtwork questions
These answers explain the general preparation route. Project-specific instructions remain tied to the selected packaging and quotation.
Yes. Share the product, estimated quantity, destination, timing and current artwork status. The appropriate artwork requirements can be confirmed as the project scope becomes clearer.
Not automatically. Printable areas, panels and structural details can change by size. Each size should use the dieline confirmed for that product and configuration.
Share the files you have and describe the intended placement. Any artwork preparation or design-support scope must be confirmed separately before it is treated as part of the quotation.
Screen displays and printed materials reproduce color differently. The print method, substrate, coating and finish can all affect appearance, so exact screen-to-print matching should not be assumed.
Follow the instructions supplied with the project dieline. Do not add or change production marks unless the submission instructions request them.
Yes, when the project workflow allows it. Make the artwork status clear during the inquiry or order process so the missing file remains visible before proofing or production.
Approval is one project checkpoint. The production start and timing remain subject to the confirmed quotation, payment, specifications and any other required approvals.
Plan the next step
Share the product, quantity, destination, timing and current artwork status. We can review the available route before pricing and production details are confirmed.